Attention: open in a new window. PrintE-mail

Iwaki Platform Decommissioning Project


Immediate Client Name:  SapuraAcergy Sdn Bhd

Ultimate Client:  Nippon Steel Engineering

Platform Location:  Iwaki Field, Offshore Naraha Cho, Fukushima prefecture, Japan
Water Depth:  154m

The first part of the scope consists of the jacket analysis to determine the cutting sequence, lifting and topplling on to the seabed for decommissioning by SapuraAcergy's S3000 derrick barge.  Deliverable was jacket analysis report.

The second part of the scope consists of rigging analysis and design, and preparation of rigging material requisition report for 16 topside modules for the decommissioning of the platform topsides by SapuraAcergy's S3000 derrick barge.  The lift weights of the modules, components and MSF range from less than 10MT to 1,076MT.  Deliverables include rigging design report, rigging arrangment drawings, and rigging material requisition report.  The rigging analysis and design was performed using an in-house developed software







 
JoomlaWatch 1.2.12 - Joomla Monitor and Live Stats by Matej Koval

56.9%Malaysia Malaysia
13.2%United States United States
7.6%Japan Japan
4.2%Israel Israel
3.4%Singapore Singapore
3.1%India India
2.3%Australia Australia
1.2%United Kingdom United Kingdom
0.8%Philippines Philippines
0.7%Indonesia Indonesia

Today: 7
Yesterday: 7
This Week: 32
Last Week: 127
This Month: 39
Last Month: 308
Total: 1080