Attention: open in a new window. PrintE-mail

ONGC Pipeline Replacement Project-2 (PRP-2) for Leighton Contractors (India) Pvt Ltd.


Client Name:  Leighton Contractors (India) Pvt Ltd

Project:  ONGC Pipeline Replacement Project-2 (PRP-2)

Location:  India

Scope consists of marine transportation studies and offshore pipeline installation engineering for 26 numbers of rigid pipelines and 4 numbers of partial replacement pipelines.  To be installed between 2008 and 2011.  Engineering analyses include barge stability and seafastening design for marine transportation of rigid pipelines and flexible pipeline reels, static and dynamic pipelay, anchor and bow-string start-ups, abandonment & recovery, weld repair, and riser installation using multiple davit lifts.





 
JoomlaWatch 1.2.12 - Joomla Monitor and Live Stats by Matej Koval

56.9%Malaysia Malaysia
13.2%United States United States
7.6%Japan Japan
4.2%Israel Israel
3.4%Singapore Singapore
3.1%India India
2.3%Australia Australia
1.2%United Kingdom United Kingdom
0.8%Philippines Philippines
0.7%Indonesia Indonesia

Today: 7
Yesterday: 7
This Week: 32
Last Week: 127
This Month: 39
Last Month: 308
Total: 1080