Design of Pipelay Systems

Attention: open in a new window. PrintE-mail

REAL’s resources will be able to assist competently in the design of the pipelay system including all the handling and pipelaying systems required for S-Lay vessels. This capability extends to design of stingers as well. We are capable of performing optimization studies for the pipe ramp and stinger profile to maximize the capability of any lay vessel being designed.


We are also able to perform pipe handling equipment layout, optimization of deck space, optimization of other equipment related to pipelaying such as A & R winch, mooring winch, pipe handling equipment layout, etc.

REAL is capable of performing dynamic motion analyses to obtain the ROA of the vessel and perform mooring analysis to determine the vessels operating envelope.

 

JoomlaWatch 1.2.12 - Joomla Monitor and Live Stats by Matej Koval

60.3%Malaysia Malaysia
6.5%United States United States
6.3%Japan Japan
4.7%Thailand Thailand
4.5%Singapore Singapore
3.4%Australia Australia
2.1%United Kingdom United Kingdom
1.9%India India
1.1%Indonesia Indonesia
1%Israel Israel

Today: 28
Yesterday: 24
This Week: 28
Last Week: 382
This Month: 74
Last Month: 1888
Total: 5422